{"id":2360,"date":"2026-08-21T13:48:26","date_gmt":"2026-08-21T13:48:26","guid":{"rendered":"https:\/\/www.buffaloextracts.com\/knowledge\/?p=2360"},"modified":"2026-08-21T13:49:34","modified_gmt":"2026-08-21T13:49:34","slug":"eu-gmp-annex-11-scada-extraction-systems","status":"publish","type":"post","link":"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/","title":{"rendered":"EU GMP Annex 11: What It Means for SCADA-Controlled Extraction Systems"},"content":{"rendered":"<div class=\"vce-row-container\" data-vce-boxed-width=\"true\"><div class=\"vce-row vce-row--col-gap-30 vce-row-equal-height vce-row-content--top\" id=\"el-cc904366\" data-vce-do-apply=\"all el-cc904366\"><div class=\"vce-row-content\" data-vce-element-content=\"true\"><div class=\"vce-col vce-col--md-auto vce-col--xs-1 vce-col--xs-last vce-col--xs-first vce-col--sm-last vce-col--sm-first vce-col--md-last vce-col--lg-last vce-col--xl-last vce-col--md-first vce-col--lg-first vce-col--xl-first\" id=\"el-44116933\"><div class=\"vce-col-inner\" data-vce-do-apply=\"border margin background  el-44116933\"><div class=\"vce-col-content\" data-vce-element-content=\"true\" data-vce-do-apply=\"padding el-44116933\"><div class=\"vce-text-block\"><div class=\"vce-text-block-wrapper vce\" id=\"el-b9c1750c\" data-vce-do-apply=\"all el-b9c1750c\"><h2><strong>Annex 11 Compliance Is an Ongoing Operational Discipline, Not a One-Time Validation Event<\/strong><\/h2><p>EU GMP Annex 11 SCADA extraction compliance is one of the most technical regulatory requirements facing regulated extraction manufacturers that use computerised systems for process control and data recording. Published as part of EU GMP EudraLex Volume 4 Annex 11 Computerised Systems, the guideline establishes the framework for validating, operating, and maintaining any computerised system that is part of a GMP-regulated manufacturing process - including the SCADA systems that control temperature, pressure, and flow parameters in supercritical CO2 and cryo-ethanol extraction equipment.<\/p><p>See How Our <a href=\"https:\/\/www.buffaloextracts.com\/co2-extraction.html\">Extraction Systems<\/a> Can Support Your Process<\/p><p>The scope of EU GMP computerised systems extraction is broader than many facilities realise: Annex 11 applies not only to the SCADA system itself, but to every element that relies on it - the instruments that feed it data, the recipe system that drives process parameters, the audit trail that records operator actions, and the data storage systems that protect batch records from loss. GMP Annex 11 extraction system compliance is not achieved once at validation - it is an ongoing operational discipline. This guide explains what Annex 11 requires from SCADA-controlled extraction systems, how computerised system validation (CSV) works in practice, and what the audit trail and data integrity requirements mean for day-to-day operations.<\/p><h2><strong>What Annex 11 Requires from SCADA in Extraction<\/strong><\/h2><p>EU GMP Annex 11 SCADA extraction requirements apply to SCADA systems that perform one or more GMP-regulated functions: controlling process parameters, recording batch data, generating batch records, managing access to GMP functions, or providing the audit trail for operator actions and system events. For supercritical CO2 extraction, a SCADA system typically performs all of these simultaneously: it controls extraction temperature (typically 35\u201380\u00b0C), pressure (typically 100\u2013350 bar), CO2 flow rate, co-solvent delivery, and separator temperature; it records these parameters continuously throughout each batch; it generates the electronic batch record; and it maintains the time-stamped audit trail of every parameter change and operator action.<\/p><p><a href=\"https:\/\/www.buffaloextracts.com\/co2-extraction.html\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1664 size-full\" src=\"https:\/\/www.buffaloextracts.com\/knowledge\/wp-content\/uploads\/2025\/10\/Studio-Gradient_Buffalo-Extraction-Systems_Website-CTA-Module_Extraction-Solutions.png\" alt=\"Co2 extraction\" width=\"1920\" height=\"800\" srcset=\"https:\/\/www.buffaloextracts.com\/knowledge\/wp-content\/uploads\/2025\/10\/Studio-Gradient_Buffalo-Extraction-Systems_Website-CTA-Module_Extraction-Solutions.png 1920w, https:\/\/www.buffaloextracts.com\/knowledge\/wp-content\/uploads\/2025\/10\/Studio-Gradient_Buffalo-Extraction-Systems_Website-CTA-Module_Extraction-Solutions-300x125.png 300w, https:\/\/www.buffaloextracts.com\/knowledge\/wp-content\/uploads\/2025\/10\/Studio-Gradient_Buffalo-Extraction-Systems_Website-CTA-Module_Extraction-Solutions-1024x427.png 1024w, https:\/\/www.buffaloextracts.com\/knowledge\/wp-content\/uploads\/2025\/10\/Studio-Gradient_Buffalo-Extraction-Systems_Website-CTA-Module_Extraction-Solutions-768x320.png 768w, https:\/\/www.buffaloextracts.com\/knowledge\/wp-content\/uploads\/2025\/10\/Studio-Gradient_Buffalo-Extraction-Systems_Website-CTA-Module_Extraction-Solutions-1536x640.png 1536w, https:\/\/www.buffaloextracts.com\/knowledge\/wp-content\/uploads\/2025\/10\/Studio-Gradient_Buffalo-Extraction-Systems_Website-CTA-Module_Extraction-Solutions-320x133.png 320w, https:\/\/www.buffaloextracts.com\/knowledge\/wp-content\/uploads\/2025\/10\/Studio-Gradient_Buffalo-Extraction-Systems_Website-CTA-Module_Extraction-Solutions-480x200.png 480w, https:\/\/www.buffaloextracts.com\/knowledge\/wp-content\/uploads\/2025\/10\/Studio-Gradient_Buffalo-Extraction-Systems_Website-CTA-Module_Extraction-Solutions-800x333.png 800w\" sizes=\"auto, (max-width: 1920px) 100vw, 1920px\" \/><\/a><\/p><p>GMP Annex 11 extraction system requirements for SCADA cover: supplier assessment (the SCADA software supplier must be assessed for GMP compliance capability), computerised system validation (the system must be formally validated before GMP use), ongoing operational controls (access management, audit trail monitoring, periodic review), and decommissioning requirements (data must remain accessible and readable for the required retention period after the system is retired).<\/p><p>The fundamental distinction that Annex 11 SCADA extraction compliance draws is between validated and non-validated systems: any SCADA system controlling a GMP process parameter or generating a GMP record must be validated. Using a non-validated SCADA system for GMP production - even temporarily - is a fundamental compliance failure and a routine inspection finding. Change control in GMP extraction is also directly connected: any modification to validated SCADA hardware or software must pass through the change control GMP extraction process, with impact assessment determining whether re-qualification testing is required.<\/p><h3><strong>Computerised System Validation: The CSV Lifecycle<\/strong><\/h3><p>Computerised system validation extraction (CSV) is the documented evidence that a SCADA system does what it is designed to do, consistently and correctly, throughout its operational life. CSV extraction GMP Annex 11 follows the <a href=\"https:\/\/ispe.org\/publications\/guidance-documents\/gamp-5-guide-2nd-edition\">ISPE GAMP 5 lifecycle model<\/a>, which Annex 11 formally recognises. The CSV lifecycle for GMP Annex 11 extraction documentation covers:<\/p><ul><li style=\"list-style-type: none;\"><ul><li><strong>User Requirements Specification (URS):<\/strong> what the SCADA system must do in GMP terms - recipe control, audit trail, access management, data integrity, alarm management. The URS is the root document from which all validation testing derives.<\/li><li><strong>Functional Specification (FS) and Design Specification (DS):<\/strong> how the SCADA system implements the URS requirements, and the technical design that implements the functional specification.<\/li><li><strong>Installation Qualification (IQ):<\/strong> documented verification that the SCADA hardware and software are installed as specified.<\/li><li><strong>Operational Qualification (OQ):<\/strong> documented testing that the system operates within specified parameters - including recipe execution, alarm response, audit trail function, and access control behaviour - under defined test conditions.<\/li><li><strong>Performance Qualification (PQ):<\/strong> documented evidence that the system performs consistently under representative production conditions, completing the SCADA GMP validation extraction lifecycle.<\/li><\/ul><\/li><\/ul><p>GMP Annex 11 extraction validation requires change control throughout the system's life: any modification to validated SCADA software or hardware requires impact assessment and potentially re-qualification testing. EU GMP Annex 11 extraction documentation must cover all post-validation changes with the same rigour as the initial validation.<\/p><h3><strong>Audit Trail Requirements for SCADA-Controlled Extraction<\/strong><\/h3><p>GMP Annex 11 extraction audit trail requirements are among the most specific and operationally critical elements of Annex 11. The audit trail must: record all GMP-significant events in the SCADA system; include the user identity, the timestamp, and the old and new values for any data change; be computer-generated and not manually editable by operators; and be regularly reviewed.<\/p><p>For EU GMP Annex 11 SCADA extraction, GMP-significant events that must be captured include: recipe initiation and completion; any deviation of a controlled parameter from its setpoint beyond the defined alarm threshold; any operator modification of a setpoint during a run (with before\/after values); any alarm acknowledgement; any recipe edit under change control; system login and logout events; and any attempt to access a function for which the user does not have authorisation.<\/p><p>Annex 11 SCADA extraction compliance requires that audit trail review is a defined activity - not something that only happens during investigations. The GMP Annex 11 extraction audit trail review cadence (typically integrated into batch record review, at minimum monthly) ensures that SCADA data integrity is maintained and anomalies are detected promptly. An audit trail that exists but is never reviewed is not functioning as a GMP control, and inspectors will ask for evidence of systematic GMP Annex 11 extraction audit trail review as part of any EU GMP computerised systems extraction assessment.<\/p><h3><strong>Access Control, Data Integrity, and User Account Management<\/strong><\/h3><p>GMP computerised system extraction access management is an Annex 11 operational requirement, not an IT preference. Annex 11 requires that access to GMP-regulated SCADA functions is role-based and controlled: operators can execute approved recipes and acknowledge alarms; technicians can modify parameters within defined limits with appropriate authorisation; recipe editors can modify recipes under change control; and administrators can configure the system. Each role's access is formally defined, approved by QA, and regularly reviewed when personnel change roles.<\/p><p>Annex 11 SCADA extraction compliance explicitly requires that shared passwords and generic login accounts are not used for GMP-regulated functions. Every action in the SCADA audit trail must be attributable to a specific, identified individual. The use of shared accounts - where multiple operators log in under a single username - makes audit trail data meaningless for investigation purposes and is a routine finding in EU GMP computerised systems extraction inspections. This connection between access control and data integrity is why inspectors treat shared accounts as a data integrity finding, not merely an access management gap.<\/p><h3><strong>Where Buffalo Extraction Systems Fits In<\/strong><\/h3><p>Buffalo Extraction Systems extraction equipment runs on SCADA platforms designed for GMP Annex 11 extraction system compliance from the outset. The BES SCADA provides: recipe-based process control with locked recipe execution during GMP runs; a computer-generated, non-editable audit trail capturing all parameter changes, alarm events, and operator actions with user identity and timestamps; role-based access control with individual user accounts; and electronic batch record generation. The CSV extraction GMP Annex 11 documentation package available with BES systems includes the system description, functional specification, IQ\/OQ protocol templates, and the validation test evidence framework needed to complete SCADA GMP validation extraction within the facility's validation programme.<\/p><p>Hygienic design principles and cGMP compliance for pharmaceutical CO2 extraction and <a href=\"https:\/\/www.buffaloextracts.com\/knowledge\/how-does-buffalo-extraction-systems-ensure-gmp-compliance-for-your-extraction-process\/\">how BES ensures GMP compliance for your extraction process<\/a> cover the full compliance documentation package. CAPA in GMP extraction: how to fix problems properly explains how the SCADA audit trail supports root cause investigation when deviations occur. Three CO2 SCFE scales: 5L\u00d72, 25L\u00d72, and 100L\u00d72; cryo-ethanol at 5 kg, 20 kg, and 50 kg per batch. CE, ASME, and PED certified; cryo-ethanol systems also ATEX certified; supplied with GMP documentation (USFDA, Health Canada, EU-GMP as required).<\/p><h3><strong>Conclusion<\/strong><\/h3><p>EU GMP Annex 11 SCADA extraction compliance is a continuous operational discipline. GMP Annex 11 extraction system requirements for validation, audit trail, access control, and data integrity apply throughout the operational life of every SCADA-controlled extraction system. A facility that completes CSV extraction GMP Annex 11 validation at installation and then operates the SCADA system without ongoing compliance controls - undocumented access changes, unreviewed audit trails, uncontrolled recipe modifications - has a validated system operating without its validation controls intact. The GMP computerised system extraction compliance state is assessed by regulators against the actual operational practice, not the validation report on file.<\/p><h4><strong>Related Articles<\/strong><\/h4><ul><li><a href=\"https:\/\/www.buffaloextracts.com\/knowledge\/gmp-compliance-botanical-extracts-co2-extraction\/\">GMP Compliance for Botanical Extracts via CO2 Extraction<\/a><\/li><li><a href=\"https:\/\/www.buffaloextracts.com\/knowledge\/supplement-purity-safety-potency-validation\/\">Supplement Purity, Safety and Potency Validation<\/a><\/li><li><a href=\"https:\/\/www.buffaloextracts.com\/knowledge\/large-scale-herbal-extraction-methods\/\">Large-Scale Herbal Extraction Methods<\/a><\/li><\/ul><h2><strong>Frequently Asked Questions<\/strong><\/h2><p><strong>What is EU GMP Annex 11 and why does it apply to SCADA extraction systems?<\/strong><\/p><p>EU GMP Annex 11 is the European GMP guideline for computerised systems used in regulated manufacturing. EU GMP Annex 11 SCADA extraction requirements apply because SCADA systems in extraction facilities control GMP process parameters, generate electronic batch records, and maintain the audit trail of operator actions - all functions that Annex 11 governs. GMP Annex 11 extraction system validation, audit trail, and access control requirements apply to any computerised system performing a GMP-regulated function, regardless of whether it is a process control system, a laboratory information system, or a data historian.<\/p><p><strong>What is computerised system validation (CSV) for extraction SCADA?<\/strong><\/p><p>Computerised system validation extraction (CSV) is the documented evidence that the SCADA system does what it is designed to do, consistently. CSV extraction GMP Annex 11 follows the GAMP 5 lifecycle: URS, FS, DS, IQ, OQ, PQ. SCADA GMP validation extraction covers recipe control behaviour, alarm management, audit trail function, access control, data integrity, and backup and recovery. The validation lifecycle continues beyond initial qualification: any change to the validated SCADA system requires impact assessment and potentially re-qualification testing through the GMP change control extraction programme.<\/p><p><strong>What does Annex 11 require from the SCADA audit trail in an extraction facility?<\/strong><\/p><p>GMP Annex 11 extraction audit trail requirements specify that the audit trail must be: computer-generated and non-editable; capturing all GMP-significant events with user identity, timestamp, and old\/new values; regularly reviewed (not only in response to investigations); retained for the GMP record retention period; and human-readable or convertable without special tools. Annex 11 SCADA extraction compliance for audit trails is assessed by inspectors against actual operational practice - review frequency, user identity traceability, and protection from deletion or modification.<\/p><p><strong>What access control requirements does Annex 11 impose on SCADA-controlled extraction?<\/strong><\/p><p>EU GMP computerised systems extraction access control requirements under Annex 11 require role-based access: each user has a unique individual account, access rights are defined by role and approved by QA, shared accounts and generic logins are prohibited for GMP functions, and access rights are regularly reviewed. GMP Annex 11 extraction validation of access control is tested during OQ and verified periodically in operation. The audit trail must attribute every SCADA action to a specific, identifiable individual - shared accounts render the audit trail meaningless for investigation.<\/p><p><strong>How often must SCADA systems be revalidated under EU GMP Annex 11?<\/strong><\/p><p>SCADA GMP validation extraction does not require scheduled periodic revalidation - revalidation is triggered by change. GMP Annex 11 extraction validation requires that any change to validated SCADA hardware, software, or configuration passes through the change control process, with impact assessment determining whether IQ, OQ, or PQ retesting is required. EU GMP Annex 11 extraction documentation for all post-validation changes must be maintained and available for inspection. Periodic review (typically annual) is required to confirm the validated system remains in a controlled state - but this is a compliance review, not a full revalidation.<\/p><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Annex 11 Compliance Is an Ongoing Operational Discipline, Not a One-Time Validation EventEU GMP Annex 11 SCADA extraction compliance is one of the most technical regulatory requirements facing regulated extraction manufacturers that use computerised systems for process control and data recording. Published as part of EU GMP EudraLex Volume 4 Annex 11 Computerised Systems, the &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/\"> <span class=\"screen-reader-text\">EU GMP Annex 11: What It Means for SCADA-Controlled Extraction Systems<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":1,"featured_media":1134,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-2360","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>EU GMP Annex 11 SCADA Extraction: Compliance Requirements Explained<\/title>\n<meta name=\"description\" content=\"A practical guide to GMP Annex 11 extraction system requirements - EU GMP computerised systems extraction, CSV validation, audit trail, and SCADA GMP compliance for extraction manufacturers.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"EU GMP Annex 11 SCADA Extraction: Compliance Requirements Explained\" \/>\n<meta property=\"og:description\" content=\"A practical guide to GMP Annex 11 extraction system requirements - EU GMP computerised systems extraction, CSV validation, audit trail, and SCADA GMP compliance for extraction manufacturers.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/\" \/>\n<meta property=\"og:site_name\" content=\"Buffalo Extraction System\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-21T13:48:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-21T13:49:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.buffaloextracts.com\/knowledge\/wp-content\/uploads\/2023\/09\/BES_supercritical-fluid-extraction-process.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/\",\"url\":\"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/\",\"name\":\"EU GMP Annex 11 SCADA Extraction: Compliance Requirements Explained\",\"isPartOf\":{\"@id\":\"https:\/\/www.buffaloextracts.com\/knowledge\/#website\"},\"datePublished\":\"2026-08-21T13:48:26+00:00\",\"dateModified\":\"2026-08-21T13:49:34+00:00\",\"author\":{\"@id\":\"https:\/\/www.buffaloextracts.com\/knowledge\/#\/schema\/person\/3e7ac520197fbb367f332b811fde2fb8\"},\"description\":\"A practical guide to GMP Annex 11 extraction system requirements - EU GMP computerised systems extraction, CSV validation, audit trail, and SCADA GMP compliance for extraction manufacturers.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.buffaloextracts.com\/knowledge\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"EU GMP Annex 11: What It Means for SCADA-Controlled Extraction Systems\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.buffaloextracts.com\/knowledge\/#website\",\"url\":\"https:\/\/www.buffaloextracts.com\/knowledge\/\",\"name\":\"Buffalo Extraction System\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.buffaloextracts.com\/knowledge\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.buffaloextracts.com\/knowledge\/#\/schema\/person\/3e7ac520197fbb367f332b811fde2fb8\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.buffaloextracts.com\/knowledge\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8aa1e6e2996acb3e81fa4a0f998fa83ba725cb8468c7f746aff74d9051fef921?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8aa1e6e2996acb3e81fa4a0f998fa83ba725cb8468c7f746aff74d9051fef921?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/www.buffaloextracts.com\/knowledge\"],\"url\":\"https:\/\/www.buffaloextracts.com\/knowledge\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"EU GMP Annex 11 SCADA Extraction: Compliance Requirements Explained","description":"A practical guide to GMP Annex 11 extraction system requirements - EU GMP computerised systems extraction, CSV validation, audit trail, and SCADA GMP compliance for extraction manufacturers.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/","og_locale":"en_US","og_type":"article","og_title":"EU GMP Annex 11 SCADA Extraction: Compliance Requirements Explained","og_description":"A practical guide to GMP Annex 11 extraction system requirements - EU GMP computerised systems extraction, CSV validation, audit trail, and SCADA GMP compliance for extraction manufacturers.","og_url":"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/","og_site_name":"Buffalo Extraction System","article_published_time":"2026-08-21T13:48:26+00:00","article_modified_time":"2026-08-21T13:49:34+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/www.buffaloextracts.com\/knowledge\/wp-content\/uploads\/2023\/09\/BES_supercritical-fluid-extraction-process.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/","url":"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/","name":"EU GMP Annex 11 SCADA Extraction: Compliance Requirements Explained","isPartOf":{"@id":"https:\/\/www.buffaloextracts.com\/knowledge\/#website"},"datePublished":"2026-08-21T13:48:26+00:00","dateModified":"2026-08-21T13:49:34+00:00","author":{"@id":"https:\/\/www.buffaloextracts.com\/knowledge\/#\/schema\/person\/3e7ac520197fbb367f332b811fde2fb8"},"description":"A practical guide to GMP Annex 11 extraction system requirements - EU GMP computerised systems extraction, CSV validation, audit trail, and SCADA GMP compliance for extraction manufacturers.","breadcrumb":{"@id":"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.buffaloextracts.com\/knowledge\/eu-gmp-annex-11-scada-extraction-systems\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.buffaloextracts.com\/knowledge\/"},{"@type":"ListItem","position":2,"name":"EU GMP Annex 11: What It Means for SCADA-Controlled Extraction Systems"}]},{"@type":"WebSite","@id":"https:\/\/www.buffaloextracts.com\/knowledge\/#website","url":"https:\/\/www.buffaloextracts.com\/knowledge\/","name":"Buffalo Extraction System","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.buffaloextracts.com\/knowledge\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.buffaloextracts.com\/knowledge\/#\/schema\/person\/3e7ac520197fbb367f332b811fde2fb8","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.buffaloextracts.com\/knowledge\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8aa1e6e2996acb3e81fa4a0f998fa83ba725cb8468c7f746aff74d9051fef921?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8aa1e6e2996acb3e81fa4a0f998fa83ba725cb8468c7f746aff74d9051fef921?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/www.buffaloextracts.com\/knowledge"],"url":"https:\/\/www.buffaloextracts.com\/knowledge\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.buffaloextracts.com\/knowledge\/wp-json\/wp\/v2\/posts\/2360","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.buffaloextracts.com\/knowledge\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.buffaloextracts.com\/knowledge\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.buffaloextracts.com\/knowledge\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.buffaloextracts.com\/knowledge\/wp-json\/wp\/v2\/comments?post=2360"}],"version-history":[{"count":2,"href":"https:\/\/www.buffaloextracts.com\/knowledge\/wp-json\/wp\/v2\/posts\/2360\/revisions"}],"predecessor-version":[{"id":2362,"href":"https:\/\/www.buffaloextracts.com\/knowledge\/wp-json\/wp\/v2\/posts\/2360\/revisions\/2362"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.buffaloextracts.com\/knowledge\/wp-json\/wp\/v2\/media\/1134"}],"wp:attachment":[{"href":"https:\/\/www.buffaloextracts.com\/knowledge\/wp-json\/wp\/v2\/media?parent=2360"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.buffaloextracts.com\/knowledge\/wp-json\/wp\/v2\/categories?post=2360"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.buffaloextracts.com\/knowledge\/wp-json\/wp\/v2\/tags?post=2360"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}